Installation of Automatic Water Level Monitoring Sensor in Tila River
Client: ERMC Pvt. Ltd.
We have successfully installed and been operating automatic water level recorder in Tila River for the hydrological study of Tila Khola Hydropower Project. This station serves as a basis for estimating daily flow by continuously monitoring water level variations in Tila River. Considering the climate change impact on hydrological extremities, we have installed this station at very high level from the river bed.